
Project Details
- Al Qasr Mall Renovation
- 9th November 2020
- Al Qasr Real Estate Holdings
- ELV Systems, Firefighting
Project Description
Lemos International successfully delivered a comprehensive renovation of the Extra Low Voltage (ELV) and firefighting systems at Al Qasr Mall, a prominent retail destination in the region. The project aimed to modernize the mall’s infrastructure by integrating advanced IP-based CCTV surveillance systems and FM-200 fire suppression technology while ensuring uninterrupted operations during the upgrade process.
Our scope of work included:
- ELV Systems: Design, supply, installation, and commissioning of state-of-the-art IP-based CCTV cameras, access control systems, and structured cabling solutions.
- Firefighting Systems: Installation of an FM-200 clean agent fire suppression system, complete with detection, alarm, and control panels, ensuring compliance with Civil Defense regulations.
- Phased Execution: Conducted works in carefully planned phases to minimize disruption to mall tenants and visitors.
The project was executed with meticulous attention to detail, adhering to international standards and delivering a seamless blend of safety, security, and operational efficiency.
Key Features of the Project
Advanced ELV Infrastructure
- Upgraded the existing analog CCTV system to a fully digital IP-based solution, offering superior image quality, remote monitoring capabilities, and enhanced cybersecurity features.
- Installed smart access control systems to streamline entry management and improve overall security within the mall premises.
- Deployed structured cabling networks to support future scalability and integration with other smart building technologies.
Cutting-Edge Fire Suppression
- Implemented FM-200 gas-based fire suppression systems, which are environmentally friendly and highly effective for protecting sensitive areas such as server rooms and electrical panels.
- Integrated intelligent smoke detectors, heat sensors, and alarm systems to provide early warning and rapid response in case of emergencies.
Operational Continuity During Renovation
- Adopted a phased execution strategy that allowed the mall to remain fully operational throughout the renovation period.
- Coordinated closely with mall management and tenants to ensure minimal impact on daily activities and customer experience.
Compliance & Safety Assurance
- Secured full approval from Dubai Civil Defense authorities, meeting all regulatory requirements for firefighting systems.
- Conducted rigorous testing and commissioning procedures to guarantee the reliability and performance of installed systems.



What is Challenge for client?
Challenge 1: Maintaining Mall Operations
Renovating critical systems in a bustling retail environment posed significant logistical challenges, as any disruptions could negatively impact tenant businesses and customer footfall.
Solution:
To address this challenge, we implemented a day/night shift plan, conducting noisy or intrusive tasks during nighttime hours when mall traffic was minimal. This approach ensured zero disruption to retail operations and preserved the shopping experience for customers.
Challenge 2: Securing Civil Defense Approvals
Obtaining approvals from Dubai Civil Defense for firefighting systems required strict adherence to technical specifications and thorough documentation.
Solution:
Our team collaborated closely with Civil Defense officials throughout the project lifecycle, ensuring that all design and installation aspects met their stringent requirements. Comprehensive testing and certification processes were conducted to secure final approval.
Challenge 3: Integrating New Systems with Legacy Infrastructure
Upgrading the ELV and firefighting systems involved interfacing new equipment with existing infrastructure, which required careful planning to avoid compatibility issues.
Solution:
We employed modular integration techniques, using adaptable hardware and software solutions to bridge the gap between old and new systems. Extensive pre-installation testing ensured smooth functionality post-upgrade.
Outcome & Client Satisfaction
The successful completion of the Al Qasr Mall renovation underscores Lemos International’s ability to deliver complex projects in live environments without compromising quality or timelines. Key achievements include:
- Enhanced Security: The upgraded ELV systems have significantly improved the mall’s security posture, providing real-time monitoring and centralized control over access points.
- Improved Safety: The FM-200 fire suppression system ensures rapid response to potential fire hazards, safeguarding lives and property.
- Seamless Operations: Our phased execution strategy enabled the mall to maintain normal business operations throughout the renovation, earning praise from both the client and tenants.
- Regulatory Compliance: Full Civil Defense approval was secured, reflecting our commitment to meeting local safety standards.
The client expressed high satisfaction with the outcome, citing our professionalism, technical expertise, and dedication to delivering exceptional results.
Why Choose Lemos International?
At Lemos International, we specialize in delivering innovative electromechanical solutions tailored to the unique needs of our clients. Our core strengths include:
- Expertise Across Disciplines: From ELV systems and firefighting to HVAC and electrical contracting, we offer end-to-end services under one roof.
- Proven Experience in Live Environments: Our team excels at executing complex projects in occupied spaces, ensuring minimal disruption to ongoing operations.
- Commitment to Quality: We adhere to the highest industry standards, leveraging cutting-edge technologies and best practices to deliver reliable, long-lasting solutions.
- Client-Centric Approach: Every project is managed with transparency, collaboration, and a focus on achieving client objectives.